In recent years, the world has to pay attention to carbon neutrality. According to the latest survey data from Energy & Climate think tank “Ember” wind-power generation account for 6.7% of global energy power generation by 2021. Renewable energy power generation compared to non-renewable energy power generation (oil, natural gas, nuclear energy... Etc.) is increasing year by year, while non-renewable energy is decreasing. On the other side, the license price of the EU carbon market is once a record high at 96 euros. All the signs show that the international organization attaches importance to the environment.
1. Wind power system settings have significant ambient temperature differences and severe wind and sand, so the requirements for operating temperatures are strict.
2. Based on ensuring communication reliability and remote monitoring information security, a more secure network setting is required.
3. Due to the limitations of the geographical environment and working environment, the use of products needs to pass the seismic tests.
4. Wind racks are far apart, so they must be monitored remotely by using a network with long-distance transmission capabilities.
China has actively promoted green and low-carbon emission facilities in recent years and vigorously developed green industries such as wind power generation.
Some customers said that because of the replacement of the converter, the new converter would cause the central control of the converter and the generator's main controller to be unable to communicate.
The command between the converter and the generator will not be established if information failure is obtained. The customer is afraid that it will cause current and voltage output problems.
In this case, the converter uses Profinet protocol, and the central controller of the generators uses Modbus communication; the two main controllers cannot communicate due to the different protocols.
Fortunately, Cermate has been focused on the communication protocol for many years. We provide more than 500 communication protocol drivers to help customers solve the problem between controllers. Therefore, Cermate recommends that customers use the ES21-A02 protocol gateway as a bridge between the two controllers. The operating temperature of ES21-A02 is -20 ° C ~ 70 ° C, the relative humidity 10% ~ 90%, and the vibration-resistant: Random vibration 1 Grms (5 ~ 500 Hz), in line with the needs of wind power products.
Cermate also recommends that customers use PanelExpress to build a wind-power field monitoring system with the Inter-Device Connection Service (IDCS) for visual data analysis, which is secure network encrypted transmission and provides wind-energy equipment data as the basis for on-site monitoring. In addition, the customers consider that the maintainers will regularly inspect the wind field outside, which is broad. Hence, they hope the maintainer can receive alarm messages if they are out of the office. However, using the IDCS to connect the protocol gateway with the mobile, the maintainer can receive emergent notifications immediately through the social media Line or WeChat. Last but not least, all of the messages are for free!!
1. ES21-A02 Protocol Gateway had a built-in 2LAN (Switch) / 4COM
2. Built-in in 500+ Communication Protocols and supports Modbus and Siemens' Profinet communication.
3. Flexible Expansion DI/DO and AI/VI/AO/VO.
4. PannelExpress provides data analysis and a visual monitoring system suitable for large-scale field planning.
5. Support Amazon AWS, Microsoft Azure, Alibaba Cloud…etc. The mainstream MQTT platform.
6. Supports the OPC UA communication protocol to help quickly connect with the IT site.